Print this page

WWUD FEES

  • Residential Connection Fee  $40 (see below for Commercial Connection Fee Schedule)
  • Door Hanger Fee  $20
  • Reset Fee  $25   or  $50 after hours
  • Bad Check Fee  $25
  • Residential Tap  $2000 (includes meter & installation)
  • Residential Watering Tap  $2000 (includes meter & installation)

COMMERCIAL CONNECTION FEES (based on Tap size)

Tap Size

Connection Fee

Tap Size

Connection Fee

3/4"
$75
4"
$400
1"
$100
6”
$600
1.5"
$150
8”
$800
2"
$200
10”
$1000
3"
$300
12”
$1200

 

COMMERCIAL TAP FEES & RESIDENTIAL TAP FEES ABOVE 3/4"

(Installed by District)

Tap Size

Tap Fee

3/4" Tap
$2,250.00
(incl. Meter & Inst.)
1" Tap
$3,250.00
(incl. Meter & Inst.)
1 1/2" Tap
$4,750.00
(incl. Meter & Inst.)

2" Tap

$6,250.00

(incl. Meter & Inst.)


COMMERCIAL DEVELOPMENT OR INDIVIDUAL COMMERCIAL TAP FEES


(Contractor Installed  and does not include Meter)

Tap Size

Tap Fee

Tap Size

Tap Fee

3/4" Tap
$2,000.00
4"
$8,500.00
1" Tap
$2,500.00
6"
$12,500.00
1 1/2" Tap
$3,500.00
8"
$16,500.00
2" Tap
$4,500.00
10"
$20,500.00
3"
$6,500.00
12"
$24,500.00

All Commercial Taps will be subject to Commercial Capacity Fees including Conversion of existing structures to Commercial Use
Commercial Watering Taps will follow the above schedule

 

FIRE LINE TAPS (Contractor will install)

2"
$4,500.00
4"
$8,500.00
6"
$12,500.00
8"
$16,500.00
10"
$20,500.00

12"

$24,500.00

All Fire Line Taps will  be billed the following each month:

Number of minimum bills per size tap    
Private Fire Hydrants @$15.00 each    
Sprinkler Heads @$.15 each

 

DEVELOPMENT FEES


Application Fees  @$45.00 per lot or $180.00 per acre,  Non-refundable

Plans in paper and electronic file forms must be submitted to West Wilson Utility District, not  sent directly to the Engineer.

When State Approved Plans are returned, the following fees must ALL be paid up front and documents provided before any work can begin:

State Review Fees

10% Contract (Legal & Administration)

Development Fees @$1,800.00 per lot (Residential Only)  
(Includes $1,100.00 Lot Fee & $700.00 Capacity Fee)    

Multi-family Development Fees @$1,800.00 per unit on single tap (regardless of Tap size)

Letter of Credit, Contract, and Deed





COMMERCIAL CAPACITY FEES

 

Schools (Non-public)..................................
$40.00 per student

Child Day Care Facility...............................

$40.00 per child  (licensed capacity)

General Category (based on sq. ft.)

Industrial Facility/Manufacturing
$.75 per sq. ft for first 5,000 sq. ft. under roof
Shopping Center/Mall (no food service)
$.50 per sq. ft. for next 5,000 sq. ft. under roof
Office Building
$.25 per sq. ft for next 10,000 sq. ft. under roof
Dentists
$.10 per sq. ft for next 80,000 sq. ft. under roof
Physicians
$.05 per sq ft for all over 100,000 sq. ft. under roof
Medical Center w/o Beds

Restaurants with no seating

Motel/Hotel.............................................
$250.00 per rental unit
Restaurant..............................................
$75.00 per seat
Self-Service Laundries...........................
$250.00 per washing or cleaning unit
Theaters, Auditorium Type.....................
$10.00 per seat
Car Wash................................................
$250.00 each bay
Medical Center w/Beds..........................
$1.00 per sq. ft total floor area
Nursing Homes......................................
$.50 per sq. ft. total floor area
Assisted Living ......................................
$.50 per sq. ft. total floor area
Warehouse.............................................
$.20 per sq. ft. for first 50,000 sq. ft. under roof
$.10 per sq. ft for next 50,000 sq. ft. under roof
$.05 per sq. ft. for all over 100,000 sq. ft. under roof

 

Any food service added to any of the above categories will be charged $45.00 per seat
Capacity Fees on Existing Buildings: On existing commercial property, no capacity fee will be charged unless tap is upsized and/or additional taps or fire lines are added; then capacity fees will be due on the entire building or complex.  If partitions are already up and the existing tap will serve a portion of the building and the new tap will serve the rest of the building, then capacity fees will be charged only on the portion the new tap will serve.  If new portion should be a restaurant, capacity fees will be charged according to seating.  Complexes may pay capacity fees in a lump sum instead of dividing them into individual units.


Previous page: Our Rates
Next page: New Service